Palantir Technologies Challenges US Government Procurement
June 22, 2016
I was a wee lad when I read Don Quixote. I know that students in Spain and some other countries study the text of the 17th century novel closely. I did not. I remember flipping through a Classics’ comic book, reading the chapter summaries in Cliff’s Notes, and looking at the pictures in the edition in my high school’s library. Close enough for horse shoes. (I got an A on the test. Heh heh heh.)
Here’s what I recall the Don and his sidekick. A cultured fellow read a lot of fantasy fiction, mixed it up the real world, and went off on adventures or sallies. The protagonist (see I remember something from Ms. Sperling’s literature class in 1960) rode a horse and charged into the countryside to kill windmills. I remember there were lots and lots of adventures, not too much sex – drugs – rock and roll, and many convoluted literary tropes.
I still like the windmills. A Google search showed me an image which is very similar to the one in the comic book I used as my definitive version of the great novel. Here it is:
What does a guy riding a horse with a lance toward a windmill have to do with search and content processing? Well, I read “Palantir Lambastes Army Over $206 Million Contract Bidding.” I assume the information in the write up is spot on.
Palantir Technologies, a unicorn which is the current fixation of a Buzzfeed journalist, is going to sue the US Army over a “to be” contract for work. The issue is an all source information system procurement known as DCGS or sometimes DI2E. The acronyms are irrelevant. What is important is that the US Army has been plugging away with a cadre of established government contractors for a decade. Depending on whom one asks, DCGS is the greatest thing since sliced bread or it is a flop.
However, Palantir believes that its augmented intelligence system is a better DCGS / DI2E. than the actual DCGS / DI2E.
The US Army may not agree and appears be on the path to awarding the contract for DCGS work to other vendors.
According to the write up:
Palantir claims the Army’s solicitation is “unlawful, irrational, arbitrary and capricious,” according to the letter of intent Palantir sent to the U.S. Army and the Department of Justice, which was obtained by Bloomberg. The letter is a legal courtesy, which states Palantir will file a formal protest in the U.S. Court of Federal Claims next week and requests the Army delay awarding the first phase of the contract until litigation is resolved. The contract is slated to be awarded by the end of 2016.
The contract is worth a couple of hundred million, but the follow on work is likely to hit nine figures. Palantir has some investors who want more growth. The best way to get it, if the write up is accurate, is on the backs of legal eagles.
I don’t know anything about the US Army and next to nothing about Palantir, but I have some experience watching vendors protest the US government’s procurement process. My thought is that when bidders sue the government:
- Costs go up. Lawyers are very busy, often for a year or more. In lawyer land, billing is really good.
- Delays occur. The government unit snagged in the contracting hassle have to juggle more balls; for example, tasks have to be completed. When the vendors are not able to begin work, delays occur. This may not be a problem in lawyer land, but in the real world, downstream dependencies can be a hitch in the git along.
- Old scores may be hummed. Palantir settled a legal dust up with IBM which owns i2 Analysts Notebook. The Analysts Notebook is the very same software system whose file structure Palantir wanted to understand. i2 was not too keen on making its details available. (Note: I was a consultant to i2 for a number of years, and this was input number one to me from one of the founders). IBM has a pretty good institutional memory without consulting Watson.)
And Don Quixote? I wonder if the Palantirians, some of whom fancy themselves Hobbits, are going to be able to shape the real world to their vision. The trajectory of this legal dust up will be interesting to watch as it flames across the sky toward Spain and Don Quixote’s fictional library. Flame out or direct hit? The US Army and US government procurement policies are able to absorb charging horses and possibly a lance poke or two.
Stephen E Arnold, June 22, 2016